Total Savings
£1,035
Payback Period
0.28 years
Assumptions
2 Carbon Tonnes saved per year
City Building decided to give their head office in Glasgow a full lighting makeover and put in energy saving upgrades throughout the building. The ROBUS TRIUMPH Activate was used throughout to provide accent lighting in areas where dimming would be required at certain times but a superior light output would be needed at other times.
The sleek modern aesthetics of the TRIUMPH Activate was perfect for use in the minimalist / contemporary office design, whilst delivering environmental savings of 2 carbon tonnes per year.
The payback period in City Building for using the TRIUMPH Activate is 0.28 years with a total energy saving of £1,035 per year.